Eliminating Level Crossings, Building a 93 Billion Yen Hospital, and Flying Cars on the Former Mariho Site—Who Benefits from the ‘Reconfiguration’ Around Hiroshima Station?

Elimination of the Atago Level Crossing—What Remains After the 'Waiting Time' Disappears As you exit the south gate of

By Rei

|

Related Articles

Elimination of the Atago Level Crossing—What Remains After the ‘Waiting Time’ Disappears

As you exit the south gate of Hiroshima Station and walk east, you will find a line of people stopped in front of a level crossing. The Atago level crossing—known as a so-called “closed crossing”—can be blocked for over 40 minutes during peak hours. Just a few hundred meters ahead, plans for a new hospital with a budget of 93 billion yen are beginning to take shape. If you shift your gaze westward, preparations are underway for a facility to experience “flying cars” at the former Marina Hop site, aiming for a spring 2028 opening.

The fact that three projects are progressing simultaneously is significant, but what stands out is how they “overlap.” All of them aim to simultaneously rewrite the movement lines for people, vehicles, and healthcare within a few kilometers radius from Hiroshima Station. This is not merely an infrastructure update; it is a reconfiguration of the very framework of the city.

—So, who benefits from this reconfiguration?

—

Elimination of the Atago Level Crossing—What Remains After the ‘Waiting Time’ Disappears

The Atago level crossing is located on the eastern side of Hiroshima Station, where the JR Sanyo Line, Kure Line, and Geibi Line intersect. Due to the high frequency of trains, the blockage time is extremely long, and it has been listed as a “closed crossing” by the Ministry of Land, Infrastructure, Transport and Tourism. During the morning rush hour, it was a common sight to see people running across just as the barriers lifted for a few seconds.

As part of the redevelopment of the south square of Hiroshima Station and the elevated project around the station, plans are underway to eliminate this level crossing. The alternative will be a pedestrian and bicycle pathway under the elevated structure or guidance to existing underpasses in the area.

From a traffic engineering perspective, the elimination of the level crossing directly contributes to alleviating congestion and ensuring pedestrian safety. If the vehicle congestion that has occurred around the Atago level crossing during peak hours is resolved, the average travel time on surrounding roads could be reduced by several minutes at a minimum.

However, I would like to pause here for a moment. The disappearance of the level crossing means that the life lines—commuting routes, shopping sequences, and children’s school paths—that have been structured around that crossing will be reset. For the elderly and those with disabilities, the burden of changing the “usual route” is not insignificant. The design details of the alternative pathways—such as steps, lighting, and width—will determine who this elimination will actually benefit.

—

The 93 Billion Yen New Hospital—The Significance of Shifting the Medical Focus to the North Exit of the Station

According to a plan announced by Hiroshima Prefecture in 2024, a new hospital will be built in the north exit area of JR Hiroshima Station, integrating and reorganizing the functions of the Prefectural Hiroshima Hospital and the municipal medical facilities. The estimated construction cost is approximately 93 billion yen. While the number of beds and medical departments will be finalized in the basic design to come, it is positioned as a hub for advanced acute care and emergency medical services.

Let’s take a different angle to consider the weight of the 93 billion yen figure. The initial budget for Hiroshima Prefecture’s general account for the 2024 fiscal year is about 1.1 trillion yen. Although this is not an amount covered in a single year, the project cost, which corresponds to about 8.5% of the prefectural budget, will be invested in a single building. Naturally, questions will arise regarding the funding structure—national subsidies, bond issuance, and allocation of general funds—and the outlook for operational revenues after completion.

On the other hand, the structural significance of this new hospital being located at the north exit of Hiroshima Station is substantial. Hiroshima Station is the largest transportation hub in the Chugoku and Shikoku regions, where the Shinkansen, conventional lines, trams, and buses converge. By placing a hub for advanced medical care here, access for patients not only from within Hiroshima City but also from Kure, Higashi-Hiroshima, and Mitsugi will be dramatically improved. Particularly for emergency transport, if a heliport is established at the north exit of the station, it will directly reduce transport times from mountainous areas.

—In other words, this hospital is designed to be both “a hospital for the citizens of Hiroshima” and “a device that consolidates the medical movement lines for the entire Hiroshima Prefecture at the station.” The relocation of the prefectural hospital from its current location to the station front is not merely an update of the building; it is an act of shifting the very center of medical access.

However, while the construction cost of 93 billion yen accounts for the risk of rising material prices, it cannot be denied that further cost overruns may occur over the years from commencement to completion. Nationwide, in recent years, large-scale public hospital constructions have often seen increases of 10-20% from initial estimates. The transparency of the budget and the accountability to citizens at each stage will determine the trust in this project.

—

The ‘Hiroshima Mobility World’ at the Former Mariho Site—A Tourist Facility or an Experimental Ground?

Planned for the approximately 6.9-hectare site of the former Marina Hop, which closed at the end of 2024, is the “Hiroshima Mobility World.” According to a proposal by the operator selected through public recruitment by Hiroshima City, it aims to open in spring 2028 as a complex facility combining experience flights of “flying cars” (eVTOL), test rides of autonomous vehicles, hot spring facilities, and a food hall.

What is noteworthy about this plan is the structure behind the glamorous term “flying cars.” Currently, commercial operations of eVTOLs have not yet been realized in Japan. The demonstration flights at the 2025 Osaka-Kansai Expo are seen as a milestone, but hurdles remain high in terms of regulatory aspects, such as obtaining type certification, establishing operational rules, and setting standards for takeoff and landing sites (vertiports).

In other words, what “experience flights” will mean by 2028—whether it involves actual boarding of aircraft, simulators, or tethered flights—will largely depend on the progress of technology and regulations. It is important to distinguish between facts and expectations in conveying this point.

Nevertheless, the essence of this plan is not solely about whether “flying cars” will actually fly. The former Marina Hop site is located in the Kannon district of western Hiroshima City, close to the Kannon entrance of the Hiroshima Expressway No. 3. By placing a new attraction here, a “western destination” will emerge along the east-west movement lines originating from Hiroshima Station. Urban development in Hiroshima has thus far concentrated around the station and the Kamiya-cho and Hatchobori areas, but if the Mobility World functions well, the flow of people will slightly expand westward.

—The question is whether public transportation supporting this “westward movement line” will be adequately developed. If the weaknesses in access that have been pointed out since the Marina Hop era are not resolved, the facility’s ability to attract visitors will become overly reliant on private cars, creating new challenges of congestion on surrounding roads.

—

Three Points Drawing a Line—Reading the Structure of ‘Reconfiguration’

The elimination of the Atago level crossing, the new hospital at the north exit of the station, and the Mobility World in the west. When viewed individually, each of these three projects has its own expectations and challenges. However, when these are simultaneously laid out on a single map, a certain structure begins to emerge.

On the eastern side of Hiroshima Station, the “physical barrier” of the level crossing will disappear. To the north, the “center of life” represented by healthcare will be drawn closer to the station. To the west, the “future movement lines” represented by mobility are being experimentally outlined. As movement lines are rewritten simultaneously in these three directions, Hiroshima Station will transform from merely a “transfer point” into a nexus of healthcare, transportation, and tourism.

This reconfiguration—who does it benefit? The most significant beneficiaries will likely be those who want to accomplish multiple tasks along a single movement line—elderly individuals combining medical visits and commuting, working families wanting to streamline school drop-offs and shopping, and business people who wish to receive medical consultations while on business trips from outside the prefecture. By consolidating movement lines, “travel for the sake of travel” will decrease. This will not only save time but also conserve physical and mental energy.

On the other hand, this consolidation also carries the risk of widening the gap with those “far from the station.” If the endpoints of public transportation become narrower, even if the area around the station becomes more convenient, those who cannot reach it will be left behind. The blueprint for reconfiguration must include considerations for the periphery, such as restructuring bus routes, introducing demand-responsive transport, and ensuring information accessibility.

—

Questions to Ask Before the System Starts Moving

Large-scale urban reconfiguration is more about the process leading up to completion than the moment it is finished. Is the allocation of the 93 billion yen appropriate? Are the alternative movement lines after the level crossing’s elimination suitable for the elderly? To what extent will the “flying cars” at the Mobility World have tangible substance at the time of opening?

How concretely can the government and operators answer these questions with specific figures and justifications? And is that answer reaching those who need it—the people who used to stop in front of the level crossing every morning, those commuting two hours one way from the northern prefecture for medical visits, and families who lost their weekend destination with the closure of Marina Hop?

Once a system starts moving, it can be beautiful. However, the task of confirming how each cog in that mechanism fits into people’s lives can only be done now, before completion.

The map around Hiroshima Station is about to be rewritten. Whether your own life is depicted at the end of that line—this is something to confirm not in the waiting room, but right now.

POPULAR ARTICLES

Related Articles

POPULAR ARTICLES

JP JA US EN